Facebook Instagram Youtube
View All Events View All Announcements

BHSJ Parking Lot Closed for Paving - UPDATED

Monday August 16, 2021 - Sunday August 22, 2021

The parking lot for the Coldwater building will be repaved through mid-August and will be unavailable for staff and clients until August 23rd.

UPDATE August 16, 2021 - There are some issues in the parking area which have extended the project until August 23rd. These issues have been reviewed and repaired, including an improperly installed drainage system with inadequate cover and unstable substructure. The substructure and drainage has been replaced, and the first coat of the asphalt has been applied. The final coat and appropriate striping will be conducted this week.

All staff will need to park in the parking lot behind the DHHS building.  Clients will be able to park in the two parking areas along the front of the DHHS building, and will need to walk up Keith Wilhelm Drive to get to the sidewalk running along the back of our building and enter through the back door closest to the VA.    Please review the image below to ensure that everyone is parking in the correct location. 

Organization Information

Annual Reports

Administration

Organization Documents

- Strategic Plan
- Mission and Vision
- Agency Organization Chart